GP32X.com - GP32 GP2X Pandora The Wiz - open source entertainment: We Are Still Doing The Boards+Population In The Usa, But It Looks Like - GP32X.com - GP32 GP2X Pandora The Wiz - open source entertainment

Jump to content

  • (17 Pages)
  • +
  • 1
  • 2
  • 3
  • 4
  • 5
  • Last »
  • You cannot start a new topic
  • You cannot reply to this topic

We Are Still Doing The Boards+Population In The Usa, But It Looks Like Can my unit be assembled by MWeston, please?

#31 User is offline   craigix

  • Mega GP Mania
  • Icon
  • Group: GP Guru
  • Posts: 6,345
  • Joined: 03-February 03
  • Gender:Male
  • Location:England

Posted 28 February 2010 - 07:48 PM

I didn't even know you could see my replies to other people on twitter.

When I say 'we' I don't mean like Ed sitting by himself in his living room building hundreds of units.

I mean our own assembly line in the UK with several (probably 8) people, and yes, the whole team will be there at least for the start of it.

This gives us far more control over the quality and other aspects of the final Pandora.

#32 User is offline   MrBlais

  • GP32 Hardcore
  • PipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 268
  • Joined: 26-March 09
  • Gender:Male
  • Location:United States
  • Interests:These vintage Pandora skins...

Posted 28 February 2010 - 07:48 PM

Damn.. That could take WEEKS to just assemble units. Considering that one person could only do about 100 consoles a day. Shit, more like MONTHS. : :unsure:

EDIT @Craig's comment above: So, that could take roughly a couple weeks to assemble all the consoles then?

This post has been edited by MrBlais: 28 February 2010 - 07:50 PM


#33 User is offline   Tensuke

  • Mega GP Mania
  • PipPipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 566
  • Joined: 16-July 08
  • Gender:Male
  • Location:Savannah, GA

Posted 28 February 2010 - 07:50 PM

View PostMrBlais, on 28 February 2010 - 02:48 PM, said:

Damn.. That could take WEEKS to just assemble units. Considering that one person could only do about 100 consoles a day. Shit, more like MONTHS. : :unsure:

That would be about 800 a day, so it would only take 5 days...?

And thanks for the details Craig, that actually sounds a bit better. :)

This post has been edited by Tensuke: 28 February 2010 - 07:51 PM


#34 User is offline   MrBlais

  • GP32 Hardcore
  • PipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 268
  • Joined: 26-March 09
  • Gender:Male
  • Location:United States
  • Interests:These vintage Pandora skins...

Posted 28 February 2010 - 07:53 PM

View PostTensuke, on 28 February 2010 - 01:50 PM, said:

View PostMrBlais, on 28 February 2010 - 02:48 PM, said:

Damn.. That could take WEEKS to just assemble units. Considering that one person could only do about 100 consoles a day. Shit, more like MONTHS. : :unsure:

That would be about 800 a day, so it would only take 5 days...?


LoL - Read it again: 100 a day meaning 700 a week equaling out to roughly two months just for assembly. Look, I wasn't going for accuracy, just a guess. :)

EDIT: OH, I see where you were going with that. Craig and I posted at the same time. I didn't know when I originally posted that he was to have a private assembly line.. Sorry.

This post has been edited by MrBlais: 28 February 2010 - 07:55 PM


#35 User is offline   Tokiopop

  • GP Mania
  • PipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 334
  • Joined: 04-October 09
  • Gender:Male
  • Location:England
  • Interests:Computers and stuff

Posted 28 February 2010 - 07:54 PM

View PostMrBlais, on 28 February 2010 - 07:48 PM, said:

Damn.. That could take WEEKS to just assemble units. Considering that one person could only do about 100 consoles a day. Shit, more like MONTHS. : :unsure:

EDIT @Craig's comment above: So, that could take roughly a couple weeks to assemble all the consoles then?

So it will take longer in the UK with 8 people rarther than 4 people in the US?

#36 User is offline   Mjlink

  • Cannabis.Pro
  • PipPipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 748
  • Joined: 13-May 08
  • Gender:Male
  • Location:Humboldt County Republic of California
  • Interests:Surf/Whitewater kayaking
    Cannabis
    Land Paddling/Longboarding
    Rock music
    Hacking/Retro video games

Posted 28 February 2010 - 07:55 PM

So everything will ship from the UK after assembled?

Will it go in batches to ED (for example) and split out from there and reshipped, or will it be shipped direct to customers worldwide from UK?

Assembly lines should be firing up some cases shortly if they are to start on Monday :D

Peace

Link

#37 User is offline   mali

  • -
  • PipPipPipPipPipPip
  • View blog
  • Group: GP32 Hardcore
  • Posts: 6,278
  • Joined: 30-September 08
  • Gender:Male
  • Location:EU

Posted 28 February 2010 - 07:57 PM

View PostTokiopop, on 28 February 2010 - 08:54 PM, said:

So it will take longer in the UK with 8 people rarther than 4 people in the US?

Actually, I dont know where these "4 people" came from. Craig said 4 people, but MWeston talked about 2 main stations and 6 sub-stations, iirc.

This post has been edited by mali: 28 February 2010 - 07:58 PM


#38 User is online   Sphinxter

  • Says What?
  • PipPipPipPipPipPip
  • View blog
  • Group: GP32 Hardcore
  • Posts: 2,814
  • Joined: 01-October 06
  • Gender:Male
  • Location:Silicon Valley California, USA

Posted 28 February 2010 - 07:59 PM

View PostTensuke, on 28 February 2010 - 11:50 AM, said:

View PostMrBlais, on 28 February 2010 - 02:48 PM, said:

Damn.. That could take WEEKS to just assemble units. Considering that one person could only do about 100 consoles a day. Shit, more like MONTHS. : :unsure:

That would be about 800 a day, so it would only take 5 days...?

And thanks for the details Craig, that actually sounds a bit better. :)


Does that include testing?

#39 User is offline   jumpman

  • Mega GP Mania
  • PipPipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 843
  • Joined: 20-May 06
  • Gender:Male
  • Location:Sin City

Posted 28 February 2010 - 07:59 PM

Thanks Craig, good to see you get in and explain something in detail before all kinds of BS starts flying! I really don't see this as a huge problem. I actually think it is best overall! This way the main team can be present, and we no longer have to worry about who, what, where, and when happening in texas!

All the final cases should just go straight to the UK, and the boards can start shipping now, and everything can meet all nice and friendly at Craigs UK spot. No more worries of shipping what to where!

I really don't see how this can delay things any further. The cases, and all the other parts just need to go to the UK, and if they start right now, the final cases will still be the only wait! A better idea in mu opinion!


Chris

#40 User is offline   ashdjones

  • zzzzzzzzz
  • PipPipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 676
  • Joined: 13-March 08
  • Gender:Male

Posted 28 February 2010 - 08:00 PM

View Postjumpman, on 28 February 2010 - 07:59 PM, said:

Thanks Craig, good to see you get in and explain something in detail before all kinds of BS starts flying!


We need something like the Bat-Signal.

#41 User is offline   second exodous

  • Mega GP Mania
  • PipPipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 1,461
  • Joined: 27-September 05
  • Gender:Male
  • Location:Utah, USA
  • Interests:Linux
    Retro Gaming

Posted 28 February 2010 - 08:01 PM

View Postcraigix, on 28 February 2010 - 12:48 PM, said:

When I say 'we' I don't mean like Ed sitting by himself in his living room building hundreds of units.

That made me LOL, poor ED.

Craig, does it bug you that people have been reading your replies all this time? Good thing you don't twitter prostitutes or drug dealers, not saying that I thought talked to those sorts of people anyway.

#42 User is online   Nova

  • I Wanna Be the Guy
  • Icon
  • Group: X-treme Team
  • Posts: 5,964
  • Joined: 27-April 05
  • Gender:Not Telling
  • Location:UK

Posted 28 February 2010 - 08:02 PM

View Postcraigix, on 28 February 2010 - 07:48 PM, said:

I didn't even know you could see my replies to other people on twitter.

When I say 'we' I don't mean like Ed sitting by himself in his living room building hundreds of units.

I mean our own assembly line in the UK with several (probably 8) people, and yes, the whole team will be there at least for the start of it.

This gives us far more control over the quality and other aspects of the final Pandora.


This is a small benefit yes, but it is probably not the reason you aren't going to have many people assembling as initially planned.

So what's the deal?

#43 User is offline   Mjlink

  • Cannabis.Pro
  • PipPipPipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 748
  • Joined: 13-May 08
  • Gender:Male
  • Location:Humboldt County Republic of California
  • Interests:Surf/Whitewater kayaking
    Cannabis
    Land Paddling/Longboarding
    Rock music
    Hacking/Retro video games

Posted 28 February 2010 - 08:06 PM

View Postjumpman, on 28 February 2010 - 11:59 AM, said:

Thanks Craig, good to see you get in and explain something in detail before all kinds of BS starts flying! I really don't see this as a huge problem. I actually think it is best overall! This way the main team can be present, and we no longer have to worry about who, what, where, and when happening in texas!

All the final cases should just go straight to the UK, and the boards can start shipping now, and everything can meet all nice and friendly at Craigs UK spot. No more worries of shipping what to where!

I really don't see how this can delay things any further. The cases, and all the other parts just need to go to the UK, and if they start right now, the final cases will still be the only wait! A better idea in mu opinion!


Chris

I agree here 100%.
It will also save you on shipping and labor if you do this in-house as well as increase quality. Can't see it holding things up either.
Hope China has their Monday morning coffee or opium or both if thats the preference these days...

Peace & Opium wars,

Link

#44 User is offline   MrBlais

  • GP32 Hardcore
  • PipPipPipPip
  • Group: GP32 Hardcore
  • Posts: 268
  • Joined: 26-March 09
  • Gender:Male
  • Location:United States
  • Interests:These vintage Pandora skins...

Posted 28 February 2010 - 08:11 PM

I don't think opium's a good idea. No more delays, right? ;)

I think I'm just getting more anxious because I'm approaching my 1 year anniversary of my purchase date (Yeah, I know a lot of you have already breached that point sometime ago). If there was any possibility of me aiding the team in assembly to make the process faster, I'd do it at the drop of a hat..

This post has been edited by MrBlais: 28 February 2010 - 08:12 PM


#45 User is offline   Trey

  • GP32 User
  • PipPipPip
  • Group: Members
  • Posts: 33
  • Joined: 23-February 10

Posted 28 February 2010 - 08:22 PM

That's kind of a shame for those of us in Texas who thought we would get our's sooner. Although having craigix and ED closer to the final assembly isn't a bad thing either.

Also just an off the wall. If we wanted to do the final assembly ourselves would that be possible?

This post has been edited by Trey: 28 February 2010 - 08:25 PM


  • (17 Pages)
  • +
  • 1
  • 2
  • 3
  • 4
  • 5
  • Last »
  • You cannot start a new topic
  • You cannot reply to this topic